Akin Elementary

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths
  • Update/Replace Plumbing Fixtures
  • Roof Repairs

Safety Concerns

  • Install Badge System
  • Install Access Control

Technology Upgrades

  • Add Wireless Access Points
  • Network Upgrades
  • New Network Cabling
  • Portable Sound System for Choir Room
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Safety Concerns

  • Replace Fire Alarms
  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016

Birmingham Elementary

Picture

Renovations & Additions

  • Roof Repairs

Safety Concerns

  • Fence Off Park
  • Install Access Control
  • Install Badge System

Technology Upgrades

  • Add Wireless Access Points
  • Network Upgrades
  • New Paging / Bell System
  • Portable Sound System for Choir Room
  • Replace Projectors
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Replace Exterior Doors
  • Install Hand Dryers in all Baths

Safety Concerns

  • Update/Replace Exterior Lighting
Beginning May 2015
Completed September 2017
Picture

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016
Picture

Safety Concerns

  • Replace Fire Alarms
Beginning August 2017
Completed September 2017

Cox Elementary

Picture

Renovations & Additions

  • Replace Carpet
  • Place Floor Tile
  • Install Hand Dryers in all Baths in all Baths

Safety Concerns

  • Install Access Control
  • Install Badge System
  • Install Security Cameras

Technology Upgrades

  • Add Wireless Access Points
  • Install New Clocks
  • Network Upgrades
  • New Paging / Bell System
  • Portable Sound System for Choir Room
  • Sound System for Gym
  • Update Cafeteria Sound System
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Exterior Paint

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016

Dodd Elementary

Picture

Renovations & Additions

  • Replace Library Countertops
  • Install Hand Dryers in all Baths
  • Interior Paint
  • Replace Water Fountains
  • Roof Repairs

Safety Concerns

  • Install Access Control
  • Install Badge System
  • Install Security Cameras

Technology Upgrades

  • Add Wireless Access Points
  • Install New Clocks
  • Network Upgrades
  • New Paging / Bell System
  • Portable Sound System for Choir Room
  • Replace Projectors
  • Sound System for Gym
  • Update Cafeteria Sound System
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Replace Exterior Doors
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Replace Carpet
  • Place Floor Tile
  • Redo Stage Floor

Safety Concerns

  • Replace Fire Alarm Panel
  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • HVAC System
Beginning May 2017
Completed September 2017

Groves Elementary

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths

Safety Concerns

  • Install Access Control
  • Install Badge System
  • Install Security Cameras

Technology Upgrades

  • Cafeteria Sound System
  • Portable Sound System for Choir Room
  • Gym Sound System
  • Add Wireless Access Points
  • Other Network Upgrades
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Interior Paint
  • Exterior Paint

Safety Concerns

  • Replace Fire Alarm Panel
  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Replace Carpet
  • Place Floor Tile
Beginning May 2017
Completed September 2017

Hartman Elementary

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths
  • Wrought Iron Inside of Playground

Safety Concerns

  • Brick Fence Around Outside of Playground
  • Install Access Control
  • Install Badge System

Technology Upgrades

  • Add Wireless Access Points
  • Network Upgrades
  • New Paging / Bell System
  • Portable Sound System for Choir Room
  • Replace Projectors
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Replace Exterior Doors
  • Furniture, Fixtures and Equipment Replacement
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Major Renovations & Upgrades
Beginning October 2015
Completed October 2016
Picture

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
  • New Network Cabling
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Replace HVAC System
Beginning May 2017
Completed September 2017

Smith Elementary

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths

Safety Concerns

  • Install Badge System
  • Install Security Cameras

Technology Upgrades

  • Add Wireless Access Points
  • Install New Clocks
  • Network Upgrades
  • New Paging / Bell System
  • Portable Sound System for Choir Room
  • Replace Projectors
  • Sound System for Gym
  • Update Cafeteria Sound System
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016

Tibbals Elementary

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths

Safety Concerns

  • Install Badge System
  • Install Access Control
  • Install Security Cameras

Technology Upgrades

  • Network Upgrades
  • New Paging / Bell System
  • Portable Sound System for Choir Room
  • Sound System for Gym
  • Update Cafeteria Sound System
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016

Watkins Elementary

Picture

Safety Concerns

  • Install Badge System

Technology Upgrades

  • Add Wireless Access Points
  • Network Upgrades
  • Portable Sound System for Choir Room
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016

Whitt Elementary

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths

Safety Concerns

  • Fencing to Enclose Entire Playground
  • Install Badge System
  • Install Security Cameras

Technology Upgrades

  • Add Wireless Access Points
  • Network Upgrades
  • New Paging / Bell System
  • Portable Sound System for Choir Room
  • Replace Projectors
  • Sound System for Gym
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Replace Office Replace Carpet

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016

George W. Bush Elementary

Picture

Future Growth

  • New School Construction
Beginning August 2015
Completed August 2016

Davis Intermediate

Picture

Renovations & Additions

  • Replace Carpet
  • Replace Floor Tile
  • Replace Bleachers
  • Install Hand Dryers in all Baths
  • Repair Concrete Outside CafĂ© and Band Hall
  • Refinish and Paint Gym Floors

Safety Concerns

  • Replace Entry Lighting
  • Install Badge System
  • Install Access Control
  • Install Security Cameras

Technology Upgrades

  • New Paging / Bell System
  • Install Digital Menu Boards
  • Cafeteria Sound System
  • Band Hall Sound System
  • Choir Room Sound System
  • Gym Sound System
  • Gym Projection System
  • Update Digital Signage
  • Add Wireless Access Points
  • Other Network Upgrades
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Technology Upgrades

  • Replace Remaining Clocks Not Done in 2013
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Major Renovations & Upgrades
Beginning August 2015
Completed August 2016
Picture

Renovations & Additions

  • Exterior Paint
  • Interior Paint

Safety Concerns

  • LED Parking Lot Lighting
Beginning May 2016
Completed September 2016

Draper Intermediate

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths

Safety Concerns

  • Install Badge System
  • Install Security Cameras

Technology Upgrades

  • Add Projection System for Gym
  • Add Wireless Access Points
  • Install Digital Menu Boards
  • Network Upgrades
  • Replace Projectors
  • Sound System for Competition Gym
  • Update Band Hall Sound System
  • Update Cafeteria Sound System
  • Update Digital Signage
  • Update Sound System for Choir Room
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Major Renovations & Upgrades
Beginning August 2015
Completed August 2016
Picture

Safety Concerns

  • LED Parking Lot Lighting
Beginning May 2016
Completed September 2016

Harrison Intermediate

Picture

Renovations & Additions

  • Replace Exterior Doors

Safety Concerns

  • Install Badge System
  • Install Access Control

Technology Upgrades

  • Add Wireless Access Points
  • Install Digital Menu Boards
  • Network Upgrades
  • Replace Projectors
  • Update Band Hall Sound System
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Install Hand Dryers in all Baths
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Major Renovations & Upgrades
Beginning October 2015
Completed October 2016
Picture

Safety Concerns

  • Additional Front Parking Lighting
  • Update/Replace Exterior Lighting
  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
  • New Network Cabling
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Replace HVAC
Beginning May 2017
Completed September 2017

Burnett Junior High

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths

Safety Concerns

  • Install Badge System
  • Install Access Control

Technology Upgrades

  • Add Wireless Access Points
  • Network Upgrades
  • Replace Projectors
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Add Tennis Courts
Beginning August 2015
Completed March 2016
Picture

Renovations & Additions

  • Major Renovations & Upgrades
Beginning October 2015
Completed October 2016
Picture

Renovations & Additions

  • Replace Boiler
  • Replace Exterior Doors

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Safety Concerns

  • LED Parking Lot Lighting
  • Replace Fire Alarms

Technology Upgrades

  • Update Digital Signage
  • New Network Cabling
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Replace HVAC
  • Exterior Paint
Beginning May 2017
Completed September 2017

Cooper Junior High

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths
  • Refinish Gym Floors

Safety Concerns

  • Install Badge System
  • Install Access Control
  • Install Security Cameras

Technology Upgrades

  • Add Projection System for Gym
  • Add Wireless Access Points
  • Network Upgrades
  • Sound System for Competition Gym
  • Update Band Hall Sound System
  • Update Cafeteria Sound System
  • Update Sound System for Choir Room
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Add Tennis Courts
Beginning August 2015
Completed March 2016
Picture

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Repair Track
  • Major Renovations & Upgrades
Beginning October 2015
Completed October 2016
Picture

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Exterior Paint
Beginning May 2017
Completed September 2017

McMillan Junior High

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths
  • Replace Marquee

Safety Concerns

  • Install Badge System
  • Install Access Control
  • Install Security Cameras

Technology Upgrades

  • Add Projection System for Gym
  • Add Wireless Access Points
  • Network Upgrades
  • New Paging / Bell System
  • Sound System for Competition Gym
  • Update Band Hall Sound System
  • Update Sound System for Choir Room
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Add Tennis Courts
Beginning August 2015
Completed March 2016
Picture

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Repair Track
  • Major Renovations & Upgrades
Beginning October 2015
Completed October 2016
Picture

Renovations & Additions

  • Additional Sidewalks
  • Replace Carpet
  • Office Renovation
  • Orchestra Instruments
  • Replace Floor Tile

Safety Concerns

  • LED Parking Lot Lighting

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Exterior Paint
Beginning May 2017
Completed September 2017

Wylie High School

Picture

Renovations & Additions

  • Major Classroom Renovations and Updates
  • Construction of Culinary Arts Facility
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Add Sidewalks
  • Additional Furniture, Fixtures and Equipment
  • Big Band Instruments
  • Replace Carpet
  • Concrete Steps
  • Add Band and Visitor Lockers
  • Replace Exterior Doors
  • Exterior Paint
  • Install Hand Dryers in all Baths
  • Interior Paint
  • Laser Level Baseball Outfield
  • Mat Floor in Weight Room @ Field House
  • Orchestra Instruments
  • Refinish Two Gym Floors
  • Replace Replace Carpet in Auditorium
  • Replace Replace Carpet in Field House
  • Replace Heater Replace Boilers
  • Replace Floor Tile in Field House
  • Replace Weight Equipment in Field House
  • Install Softball Lights
  • Turf Replacement @ MPACT
  • Replace Floor Tile
  • Replace HVAC

Safety Concerns

  • Fencing
  • Install Access Control
  • LED Lighting Parking Lot
  • Update Install Badge System Software

Technology Upgrades

  • Add Wireless Access Points
  • Network Upgrades
  • New Network Cabling
  • New Paging / Bell System
  • Replace Projectors
  • Update Fine Arts Sound Equipment in Band
  • Update Sound System in Competition Gym
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Career Tech Renovations
  • HVAC System Chiller

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Technology Upgrades

  • Update Digital Signage
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Move Parking Lot Lights

Safety Concerns

  • Replace Fire Alarms
Beginning August 2017
Completed September 2017

Wylie East High School

Picture

Renovations & Additions

  • Install Hand Dryers in all Baths
  • Purchase Big Band Instruments

Safety Concerns

  • Install Badge System

Technology Upgrades

  • Update Digital Signage
  • Replace Projectors
  • Add Wireless Access Points
  • Other Network Upgrades
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015
Picture

Technology Upgrades

  • Install New Clocks
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Construction of IMPAC Center
Beginning September 2015
Completed March 2016
Picture

Safety Concerns

  • Renovations & Upgrades
Beginning March 2016
Completed December 2016
Picture

Safety Concerns

  • LED Parking Lot Lighting
  • Security Fencing
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Additional Furniture, Fixtures and Equipment
Beginning May 2017
Completed September 2017
Picture

Technology Upgrades

  • Competition Gym Sound System
Beginning August 2017
Completed September 2017

Achieve Academy

Picture

Technology Upgrades

  • Other Network Upgrades
  • Upgrade Network Switching Closets
Beginning May 2015
Completed September 2015

Other Projects

Picture

Renovations & Additions

  • Replace Boiler (Old) at Ag Barn
  • Repair Back Parking Lot at ESC
  • Replace Exterior Doors at Shaffer Stadium
  • Turf Field at Shaffer Stadium
  • Replace Carpet at Transportation
  • Install Hand Dryers in all Baths at Transportation
  • Countertops at Wylie Stadium
  • Interior Paint at Wylie Stadium

Safety Concerns

  • Install Security Cameras at Ag Barn
  • LED Lighting Parking Lot at ESC
  • Additional Security Cameras at Transportation
  • Install Access Controls at Transportation
  • Install Access Controls at Wylie Stadium

Technology Upgrades

  • Network Upgrades at ESC
  • Upgrade Network Switching Closets at ESC
  • Network Upgrades at Transportation

Future Growth

  • Additional Buses at Transportation
Beginning May 2015
Completed September 2015
Picture

Renovations & Additions

  • Additional Parking at Transportation
  • Repair Gates at Transportation
  • Replace Floor Tile at Transportation
  • Install Hand Dryers in all Baths at Wylie Stadium

Technology Upgrades

  • Sound System at Shaffer Stadium
Beginning May 2015
Completed September 2017
Picture

Renovations & Additions

  • Install Hand Dryers in all Baths at Ag Barn
  • HVAC System at Ag Barn
  • Interior Lighting at Ag Barn

Safety Concerns

  • LED Lighting Parking Lot at Maintenance
  • LED Lighting Parking Lot at Transportation
Beginning May 2016
Completed September 2016
Picture

Renovations & Additions

  • Exterior Paint at Ag Barn
  • Interior Paint at Ag Barn
  • Exterior Paint at Transportation

Technology Upgrades

  • Update Board Room / Learning A/V Control System at ESC
Beginning May 2017
Completed September 2017
Picture

Renovations & Additions

  • Repair/Replace Roof at Shaffer Stadium

Safety Concerns

  • Replace Fire Alarm Panel at Transportation
Beginning August 2017
Completed September 2017